Heze Wind Farm Project in QingDao

Project Detail

Implementaion year of the project is 2018.9, which is owned by Heze New Energy Wind Power Co., Turbine brand is GOLDWIND, AGICO supplies foundation anchor cage assembly for 48 turbine foundations, includes grade 8.8 grade anchor bolt of M42*4470, total capacity is 96MW.

Shandong Heze Wind Farm Project, located in small Village, Heze City, Shandong Province. The total installed capacity of the project is 97.2 MW, and 54 wind turbines with a capacity of 2000kW are built, 54 sets of 2000kVA box transformers, 54 bases of wind turbines and box bases, and 4 sets of 70kV overhead collecting lines with a length of 48 km. The project is expected to have an annual on-grid power of approximately 205.58 million kWh and an annual equivalent full-load utilization period of approximately 2541 hours.

Three Gorges New Energy  Wind Power Project in Ningxia

Project Detail

Implementaion year of this project is 2019.9.11 is owned by CHINA GEZHOUBA GROUP MECHANICAL & ELECTRICAL CONSTRUCTION CO.,LTD, Turbine Company is GOLDWIND, AGICO supplies foundation anchor cage assembly for 60 turbine foundations, includes grade 10.9 anchor bolt of M48*4530, total capacity is 48MW.

The Sun Mountain Wind Power Project is located in the Sun Mountain Immigrant Development Zone of Wuzhong City, Ningxia Hui Autonomous Region. The wind resources are abundant in the area, and the equivalent hours of wind farms can reach 2002 hours. The total installed capacity of the project is 50,000 kilowatts. It is planned to install 25 sets of wind turbines with a capacity of 2000 kilowatts. After the completion of the project, the annual power generation is expected to be 100 million kilowatt hours.

Project Detail

Three Gorges New Energy Sun Mountain Phase I 50MW Wind Power Project is located in the Sun Mountain Development Zone at the junction of Yanchi, Tongxin and Hongsibao counties (districts) in Wuzhong City, Ningxia Hui Autonomous Region. The average elevation of the project site area in this area is 1298m~1371m. The construction scale of this phase of the project is 50MW, covering an area of 7.8km2. The planned land is adjacent to Yanzhong Expressway, and the road leading to the site is currently used by Datang Wind Farm for overhauling fans, so the traffic is relatively convenient. The equipment and materials required by the wind farm can be transported to the project area through this road.  AGICO supplies foundation anchor cage assembly for 60 turbine foundations, includes grade 10.9 anchor bolt of M48*4530, total capacity is 48MW. This phase of the project plans to install 25 wind turbines with a single capacity of 2000KW, an installed capacity of 50MW, and a construction period of 6 months: a 110kv step-up station will be shared with the Three Gorges New Energy Xingkengzi Phase I 30MWp photovoltaic power generation project to complete power transmission.

There are 25 fan foundations in the first phase of the wind farm, which are cast-in-situ reinforced concrete slab prestressed bolt foundation structures, with an outer diameter of 18m, a depth of 2.750m, an exposed ground of 0.850m, and a total foundation height of 3.6m (excluding cushions). . The pre-set wrong bolt assembly in the foundation, the laying bolt is connected with the upper frame.

Wind Turbine Foundation Anchor Cage Install

Ling Mountain Tea Field Wind Farm Project

Project Detail

Implementaion year of this project is 2018.2.26 is owned by CHINA GEZHOUBA GROUP MECHANICAL & ELECTRICAL CONSTRUCTION CO.,LTD, Turbine Company is GOLDWIND, AGICO supplies foundation anchor cage assembly for 20 turbine foundations, includes grade 10.9 anchor bolt of M48*4530, total capacity is 50MW.

Guangxi Shixian County Shiwan Gutian Wind Farm is located in the area of ​​100,000 Gutian in Hekou Township and Chetian Township of Guangxi Resources County. The site is about 92 kilometers away from Resource County and 198 kilometers away from Guilin City. The site of the 100,000 Gutian Wind Farm is about 2 to 16 kilometers long from north to south, about 5 to 12 kilometers wide from east to west, and covers an area of ​​about 27 square kilometers. The main work of this project is the installation of 60 wind turbines, towers and ancillary equipment with a capacity of 2.5 MW, installation of 60 boxes and 8 sets of adapters, road construction in wind farms, installation of all equipment in the booster station. And civil construction.

Project Detail

Starting from June 26, 2020, after 72 consecutive hours of hard work, the Guangxi Resources Ling Mountain Tea Field Wind Power Project undertaken by the Second Branch has completed the foundation pouring of two wind turbines number 29 and number 37. Successful pouring of the foundations for 2 wind turbines laid a solid foundation for the following step.

At 8:30 am on June 26, the foundation of number 29 wind turbine was opened and poured. Soon after warehouse is opened, rain has come, the roads were wet and slippery in many places, and the roadbed in many places subsided after being rolled by heavy vehicles, making it difficult for concrete trucks to pass. Under the premise of advance preparation, the project department took emergency measures in a timely manner, and adopted various methods such as sprinkling cement, temporary hardening, replacing blocks with rocks, and backhoe loaders towing concrete trucks for wet road sections and roadbed subsidence sections. After 44 hours of continuous fighting, the pouring of number 29 wind turbine foundation was successfully completed.

Shiwangutian-wind-farm-anchor-cage-foundation-construction
Shiwangutian-wind-farm-anchor-cage-foundation-construction
Completed Anchor Cage

Fangcheng Nanshan Wind Farm Project in China

Project Detail

Implementaion year of this project is 2015.11.27 which is owned by CPI POWER ENGINEERING COMPANY LTD, Turbine company is GOLDWIND, AGICO supplies pre-stress foundation anchor cage assembly for 100 turbine foundations, includes grade 10.9 anchor bolt of M42*3910, total capacity is 200MW.

The YuanQu County Wind Power Project is a key project for the construction of China Power Investment Power Engineering Co., Ltd. through investment promotion. The project is located in Xincheng Town, Maojiawan Town, Yanlu Township and Lishan Town of Yuanqu County. It is planned to install 100 wind turbines with a capacity of 2000KW and a new 220KV booster station. After the project is completed, the project will generate electricity annually. The amount is 44187.3 million hours.

Fangcheng Nanshan 100MW multi-energy complementary power generation project is the first project to start construction and grid-connected power generation since the establishment of Shanghai Nengke Shanxi Branch. It is located in Gaoluo Township, Fangcheng Nanshan. With a planned installed capacity of 100MW. After the project is put into operation, the annual power generation will be about 138 million kwh, and it is expected to save 42,000 tons of standard coal and 101,000 tons of carbon dioxide emissions each year,  AGICO supplies pre-stress foundation anchor cage assembly for 200 turbine foundations, includes grade 10.9 anchor bolt of M42, total capacity is 400MW, which can effectively reduce the consumption of coal resources.

 

The project started construction on June 3. At the beginning, there has been various difficulties such as tight construction schedule, heavy tasks, shortage of personnel during the epidemic, and lagging supply of equipment and materials. The Shanxi Branch planned in advance, established the Engineering Management Department and the Yuanqu Nengke Photovoltaic Project Department, arranged personnel to arrive at the scene in advance to coordinate with all parties, and the team members stayed on site to ensure the smooth progress of various tasks.

YUANQU-Wind-Farm-Project-Construction
Installed-Wind-Turbine-YUANQU-Wind-Farm-Project
foundation-view-of-YUANQU-Wind-Tower-Project

Luocheng Gaobang Mountain Wind Power Project in Pakistan

Project Detail

In Gaobang Mountain area of Luocheng County, the project has a design and construction capacity of 99.8 MW, and a total of 34 2.2MW single units and 10 2.5MW single units are installed. The construction is planned to start in the second half of 2016, and all of them will be put into operation by the end of 2017. The annual on grid power can reach 219.53 million kWh. The project is installed with 29, 1.7-103 wind turbines, with implementation of the project undertaken by Power China, as the engineering, procurement and construction (EPC) contractor. AGICO provided wind turbine anchor cage foundation material and technology service, the main product is M42 stud bolt as anchor bolt.

GE Renewable Energy and Jhimpir Energy (Pvt.) Ltd have inaugurated the 50 MW wind farm, This Power Project, in the Gharo-Keti Bandar Wind Corridor in Jhimpir, Sindh – a highly anticipated launch that seeks to further drive the growth of renewable energy in Pakistan. The project is installed with 29, 1.7-103 wind turbines, with implementation of the project undertaken by Power China, as the engineering, procurement and construction (EPC) contractor. AGICO provided wind turbine anchor cage foundation material and technology service, the main product is M42 stud bolt as anchor bolt.

Implementaion year of this project is 201711.27 is owned by POWER CHINA, Turbine Company is GOLDWIND, AGICO supplies foundation anchor cage assembly for 50 turbine foundations, includes grade 8.8 anchor bolt of M39*2700, total capacity is 100MW.

Pakistan’s HAWA (HAE) 50MW wind power general contracting project is located in the Jinping area about 120 kilometers northeast of Karachi City, Sindh Province, Pakistan, and is closely adjacent to the completed Tapal wind power project of Huadongyuan. A total of 29 GE1.7MW wind turbines are installed in the project. The diameter of the fan impeller is 103m and the hub height is 91m. It is the highest record of built and under construction projects in Pakistan, with a total installed capacity of 49.3MW. A new 132kV substation is connected to the local power grid.

 